Rainbow Beach and Cooloola Cove Sludge Handling Pads Project

Commenced
January 2026
Budget
$1.5M
Photos
11 photos
Rainbow Beach and Cooloola Cove Sludge Handling Pads Project client

Scope of works

  • Design and construction of reinforced concrete sludge handling facilities at both the Cooloola Cove and Rainbow Beach sewer treatment plants; scope included:
  • Detailed design of sludge handling pads
  • Bulk earthworks and subgrade preparation
  • Construction of reinforced concrete sludge handling pads:
  • Rainbow Beach: 1700 sqm
  • Cooloola Cave: 850 sqm
  • Design and installation of interconnecting pipework and services
  • Site restoration